Product family

Scaffolding & Shoring

Temporary works must hold firm from start to finish. GV supplies the steel components that make it possible: cuplock standards and ledgers for system scaffold, steel planks for working decks, base jacks and heavy U-head jacks to level towers, adjustable props with their pins, nuts and threaded tubes for formwork, and trench struts to hold excavations open. We source each part to the size series and standard your project requires.

Explore scaffolding & shoring systems
Scaffolding & Shoring steel components

Six families

Nine products for scaffolding and shoring.

Organized by type. Know a product by another name? Find it in the trade-names list.

Cuplock System

Product family

System scaffold

The cup-jointed frame of standards, ledgers and transoms you build access scaffold from.

  • Cuplock SystemStandards with cups every 0.5 m, locked to ledgers and transoms.
Planks

Product family

Working decks

The steel boards you lay across each lift to stand and work on.

  • PlanksForms the deck between ledgers or transoms.
Props

Product family

Props

Adjustable steel props in sizes #0 to #4, set to height under formwork or a slab.

  • PropsCarries formwork, slabs and beams at the set height.
G Pin

Product family

Prop parts

The pin, nut and threaded sleeve you replace to keep props working.

  • G PinSets the coarse height through the inner tube.
  • Prop NutFine-tunes the height on the thread.
  • Threaded TubeCarries the thread the nut runs on.
Trench Struts

Product family

Trench support

Telescopic struts you set across an excavation to hold its sides.

Where it's used

Temporary works for every stage of a build.

Facades, towers and access

Building facades, plant rooms, tanks and stair towers all need safe access at height while the work goes on. System scaffold goes up fast in regular bays and takes a full working deck at each lift. Cuplock System, Planks and Screw Jack with Base Plate & Wing Nut cover it.

Related components
FacadesStair towersIndustrial plant

Slabs, beams and formwork

Wet concrete has to be carried until it can carry itself, and the slab above often needs back-propping while the next floor is poured. Props set to height under the formwork do that job, floor by floor. Props, Threaded Tube, Prop Nut and G Pin cover it.

Related components
Slab formworkBeamsBack-propping

Falsework and heavy shoring

Bridge decks, transfer slabs and high ceilings need taller, heavier support than a single prop can give. Towers built with adjustable jacks top and bottom carry the beams that hold the formwork. Hi-Load Screw Jack with Wing Nut, Screw Jack with Base Plate & Wing Nut and Cuplock System cover it.

Related components
BridgesTransfer slabsHigh ceilings

Trenches and excavations

Drainage runs, utility trenches and pit excavations must be kept open while people work inside them. Struts set across the trench hold its sides back against the ground. Trench Struts and G Pin cover it.

Related components
DrainageUtilitiesPits

Hire fleets and spare parts

Hire companies and contractors keep large fleets of props running, and pins go missing and nuts wear. Spare parts made to the same size series keep every prop in use. G Pin, Prop Nut and Threaded Tube cover it.

Related components
Hire fleetsSpare partsMaintenance

How GV sources this

From specification to delivery in four steps.

Specify

You define the specification, drawing, or standard. We work with your engineering requirements—ASTM grades, dimensions, finishes, certifications.

Qualify partner

We audit and certify manufacturing partners in India. First-article inspection and approval. Blanket orders or scheduled releases as you need.

Inspect & document

Pre-shipment inspection and third-party verification on request. Mill test reports, coating certificates, dimensional reports—documentation packs in every container.

Deliver to US site

Consolidated shipments to US ports and job sites. Landed-cost pricing in USD. Single point of contact in Katy, Texas for order management and support.

Questions answered

Common questions about scaffolding and shoring parts.

What do prop sizes 0 to 4 mean?
Sizes 0 to 4 are a standard series of adjustable steel props, each covering a band of heights. Size 0 runs from about 1.1 to 1.8 m and size 4 from about 3.2 to 4.87 m, with sizes 1, 2 and 3 in between. GV supplies props, pins, nuts and threaded tubes to this series to support US contractors and hire equipment fleets.
What does the G pin do on a prop?
The G pin passes through a hole in the prop's inner tube and rests on the prop nut, which sets the coarse height. Its hooked shape keeps it on the prop between uses. The nut is then turned on the threaded tube to bring the prop to its final height.
What is the difference between a base jack and a hi-load screw jack?
A base jack sits under each scaffold standard on a square base plate and levels the scaffold on uneven ground. A hi-load screw jack has a larger stem and usually a U-head or fork head, and it carries beams at the top of a falsework or shoring tower.
Which cuplock parts does GV supply?
GV sources cuplock standards with top and bottom cups every 0.5 m, horizontal ledgers and transoms, base jacks, heavy U-head jacks and steel planks for the decks. The tube is 48.3 mm outside diameter with a 3.2 or 4.0 mm wall, sourced from qualified partners and managed for US job sites.
Which standards do scaffolding and shoring buyers specify?
US contractors typically reference OSHA 1926 Subpart L for scaffolds and Subpart P for trench shoring. GV sources each part to the size series and standard your specification requires.
How are trench struts sized?
Trench struts are sized by the width of trench they span, using the same 0 to 4 numbering as props. A size 0 strut closes to about 0.32 m and a size 3 opens to about 1.73 m, and each size adjusts with a pin and screw between its end plates.

Ready to get started?

Our team is ready to help you find the right products.

Start an inquiry